Track 3 · Hybrid

Hybrid (Grid + Battery) System Design

The best of both worlds: export and import like an on-grid system, plus a battery that powers your critical loads through outages and stores midday solar for the evening.

Lesson 1

How it works

A hybrid inverter manages three energy sources — PV, battery and grid — and decides every second where power should flow. Loads are split into a backup (critical) panel and normal loads.

☀ PV ArrayDC 🔋 BatteryLFP 48 V / HV Hybrid InverterMPPT + charger + grid-tieauto transfer switch ⭐ Backup Loadsfridge, lights, Wi-Fi 🏠 Main LoadsAC, heaters, EV Meter⇄ 🗼 Grid
PV DCBattery charge / dischargeAC
During an outage the inverter disconnects from the grid and keeps the backup panel alive from PV + battery.
Lesson 2

Operating modes

The mode you choose drives how you size the battery.

Backup priority

Battery stays full and is used only when the grid fails. Size battery for critical load × outage hours.

Self-consumption

Store daytime surplus, discharge in the evening, import only when the battery is empty. Size battery for evening/night consumption.

Time-of-use (TOU)

Charge when tariffs are cheap, discharge in peak-tariff hours. Size battery for peak-period energy.

Lesson 3

AC-coupled vs DC-coupled

DC-coupledAC-coupled
ArchitecturePV and battery share one hybrid inverter on the DC sideExisting grid-tie inverter + separate battery inverter on the AC side
Efficiency (PV → battery)Higher (~95%) — one conversionLower (~90%) — DC→AC→DC
Best forNew installationsRetrofitting batteries to an existing on-grid system
CostLower (one inverter)Higher (two inverters)
FlexibilityLimited by inverter PV inputVery flexible, modular
Lesson 4

Design procedure, step by step

  1. Analyse consumption and its timing

    From bills or a smart-meter export, find total daily kWh and how much is used after sunset. A typical home uses 30–50% at night.

    E_daily = Monthly kWh ÷ 30 E_night = E_daily × night share
  2. Identify critical loads

    List loads that must run during an outage (lights, fridge, router, fans, medical devices, pumps). Wire them to a dedicated backup sub-panel.

    P_critical (kW) = Σ critical loads running together E_backup = P_critical × outage hours
  3. Size the PV array

    Same method as on-grid. Add 10–20% if the battery must be fully recharged from solar each day.

    PV (kWp) = E_daily ÷ (PSH × PR)
  4. Size the battery

    Usable (kWh) = E_backup (backup) or E_night (self-consumption) — or the larger of the two
    Nominal (kWh) = Usable ÷ (DoD × η_round-trip)

    Check the battery's continuous discharge power ≥ critical load, and that its voltage (low-voltage 48 V or high-voltage 150–500 V) matches the inverter.

  5. Select the hybrid inverter

    Inverter (kW) ≥ max( P_critical × 1.25 , PV kWp ÷ 1.25 )

    Also verify: PV input voltage/current per MPPT (string sizing as on-grid), max battery charge/discharge current, backup (EPS) output rating, transfer time (<20 ms for UPS-like behaviour), and export-limit (zero-export) capability via CT sensor.

  6. Protection & wiring

    Everything from on-grid (DC isolator, SPD, MCB, RCD, earthing) plus battery fuse/breaker, battery communication cable (CAN/RS485 to BMS), CT clamp at the grid entry, and a manual bypass switch for the backup panel.

Lesson 5

Worked example

A home uses 400 kWh/month, 40% at night. Critical loads 1.5 kW, outages up to 4 h. PSH 5, PR 0.78, LFP battery (DoD 0.9, η 0.92), 550 Wp modules.

StepCalculationResult
Daily energy400 ÷ 3013.3 kWh/day
PV array13.3 ÷ (5 × 0.78) = 3.42 → 7 × 5503.85 kWp
Backup energy1.5 kW × 4 h6.0 kWh
Evening energy13.3 × 0.405.3 kWh
Battery (nominal)max(6.0, 5.3) ÷ (0.9 × 0.92)7.2 kWh → 51.2 V 150 Ah (7.7 kWh)
Hybrid invertermax(1.5 × 1.25, 3.85 ÷ 1.25)3.1 kW → choose 3.6–5 kW
⚠️

Choosing a slightly larger inverter (e.g. 5 kW) leaves room to add panels and an EV charger later — but check that your utility's export limit allows it.

Practice

Hybrid sizing calculator

Explore how operating mode and critical loads change the battery size.

Consumption

kWh / month
% of daily use

Backup

kW
hours

Site & modules

%
Wp

Results

Daily energy
PV array
Battery usable
Battery nominal
Hybrid inverter
Annual yield
Before you install

Hybrid design checklist

Test yourself

Hybrid quiz

1. What is the main advantage of hybrid over on-grid?

The battery lets the system island and supply critical loads, and store solar for later.

2. Which architecture is best for adding a battery to an existing on-grid system?

AC coupling keeps the existing grid-tie inverter and adds a battery inverter.

3. Critical load 2 kW, outage 3 h, LFP DoD 0.9, η 0.92. Nominal battery?

2 × 3 = 6 kWh usable; 6 ÷ (0.9 × 0.92) ≈ 7.2 kWh.

4. What does the CT clamp at the grid entry do?

The CT lets the inverter see net power flow for zero-export and self-consumption control.

5. In self-consumption mode, the battery is mainly sized for…

The goal is to shift daytime surplus to the hours when there is no sun.