Off-Grid (Stand-Alone) System Design
Complete energy independence. With no grid to lean on, every watt-hour must be produced, stored and delivered by your system β so careful load analysis is everything.
How it works
Panels charge a battery bank through a charge controller during the day. An off-grid inverter draws from the battery to supply AC loads around the clock. A backup generator is often added for long cloudy spells.
Design procedure, step by step
Build a load table
List every appliance with its power (W), quantity and daily hours of use. Prefer efficient appliances β every watt saved shrinks the battery and array.
E_daily (Wh) = Ξ£ (Power Γ Quantity Γ Hours)Peak load (W) = Ξ£ (Power Γ Quantity) of loads that can run togetherChoose system voltage
Higher voltage = lower current, thinner cables, lower losses.
Daily energy / inverter size System voltage < 1.5 kWh/day Β· up to ~1 kW 12 V 1.5β4 kWh/day Β· 1β3 kW 24 V > 4 kWh/day Β· > 3 kW 48 V Size the inverter
Inverter continuous (W) β₯ Peak load Γ 1.25Motor loads (pumps, fridges, compressors) draw 3β7Γ their rating at start-up β check the inverter's surge rating. A pure sine-wave inverter is recommended for motors and electronics.
Size the battery bank
Battery (Ah) = (E_daily Γ Days of autonomy) Γ· (V_sys Γ DoD Γ Ξ·_batt Γ Ξ·_inv)Typical autonomy: 1β2 days for homes with a generator, 3β5 days for critical/remote sites. Batteries in series raise voltage; in parallel raise Ah.
Size the PV array
Use the worst-month PSH (usually winter), because the system must survive the darkest month.
PV (Wp) = E_daily Γ· (PSH_worst Γ Derating Γ Ξ·_batt Γ Ξ·_inv)Derating β 0.7β0.8 for temperature, dust, mismatch and cable losses.
Size the charge controller
MPPT current (A) = PV (Wp) Γ· V_battery Γ 1.25PWM current (A) = Isc Γ N_parallel strings Γ 1.25Also check the array's cold Voc is below the controller's max PV input voltage.
Cables, fuses & protection
Battery cables carry the largest current β size them generously and fuse them close to the battery terminal (Class T or NH fuse for lithium). Add DC breakers between controller, battery and inverter, plus SPDs and earthing.
Battery chemistry comparison
| Property | Flooded lead-acid | AGM / Gel | LiFePO4 (LFP) |
|---|---|---|---|
| Usable DoD | 50% | 50β60% | 80β95% |
| Round-trip efficiency | ~80% | ~85% | ~95% |
| Cycle life (at rated DoD) | 1,200β1,500 | 500β1,200 | 3,000β6,000+ |
| Maintenance | Top-up water, equalise | None | None (BMS) |
| Upfront cost | Lowest | Medium | Highest β but lowest cost per cycle |
Lithium iron phosphate (LFP) is now the default choice for most new off-grid systems: you need roughly 40% less nominal capacity than lead-acid for the same usable energy.
Worked example
A remote cabin needs 3,000 Wh/day, peak load 1,200 W, 2 days autonomy, 48 V LFP battery (DoD 0.8, Ξ· 0.95), inverter Ξ· 0.9, worst-month PSH 5, derating 0.75, 550 Wp modules.
| Step | Calculation | Result |
|---|---|---|
| Inverter | 1,200 Γ 1.25 | 1.5 kW (choose 2 kW) |
| Battery | 3,000 Γ 2 Γ· (48 Γ 0.8 Γ 0.95 Γ 0.9) | 183 Ah β 200 Ah @ 48 V |
| Battery energy | 200 Γ 48 | 9.6 kWh |
| PV array | 3,000 Γ· (5 Γ 0.75 Γ 0.95 Γ 0.9) | 936 Wp β 2 Γ 550 = 1,100 Wp |
| Charge controller | 1,100 Γ· 48 Γ 1.25 | 28.6 A β 40 A MPPT |
Off-grid load & sizing calculator
Edit the load table and system settings β everything recalculates live.
Off-grid design checklist
Off-grid quiz
1. Which PSH value should an off-grid design use?
2. 2,400 Wh/day, 1 day autonomy, 24 V lead-acid at 50% DoD (ignore efficiency). Battery size?
3. Why choose 48 V instead of 12 V for a 5 kW system?
4. A 1,000 Wp array charges a 24 V battery. MPPT controller size?
5. Why does a water pump need a larger inverter than its rating suggests?